Great Southern Hotel Melbourne Victoria

  • 166-guest room, 3 star hotel
  • Client: Chris Penny Plumbing

G2 Aeris~8 Warm Water Delivery System

The Aeris houses a centralized thermostatic mixing valve station and incorporates a dual ring main pump set. Tempered water is automatically dosed via a Cu-Ag (copper,silver) ionisation system via the integral control system.

  • Model No: G2A8

Scope

Design and supply a high efficiency condensing hot water system and warm water reticulation package to replace existing Raypak boilers. Connect system to existing Edson 1000-litre stainless steel hot water storage cylinders. Reticulate the entire hotel with 50 Deg C tepid water to overcome high temperature water fluctuation delivery to hotel guests.

Arcare ACF Maroochydore Queensland

  • 120-bed aged care facility 
  • Client: Pipewise Plumbing

G2 Aeris~8 Warm Water Delivery System

The Aeris houses a centralized thermostatic mixing valve station and incorporates a dual ring main pump set. Tempered water is automatically dosed via a Cu-Ag (copper,silver) ionisation system via the integral control system.

  • Model No: G2A8

Noel Miller Centre Glen Iris Victoria

  • 120-bed aged care facility
  • Client: Mecwacare

G2 Aeris~Ioniser 

Scope 

Remove point of use thermostatic mixing valves and convert 4 individual plantrooms to warm water systems. Utilising the existing Rheem commercial gas storage units and making modifications to become low-temperature, primary water storage systems. Installation of braised plate heat exchangers, primary water circulation pumps, controls and copper-silver ionisation disinfection systems.

Tarralla ACF Croydon Victoria

  • 80-bed aged care facility
  • Client: Blue Cross

G2 Aeris~4 Warm Water Delivery System

The Aeris houses a centralized thermostatic mixing valve station and incorporates a dual ring main pump set. Tempered water is automatically dosed via a Cu-Ag (copper, silver) ionisation system via the integral control system.

  • Model No: G2A4

Scope

Remove existing point of use thermostatic mixing valves and install warm water delivery system onto the existing Rheem, 200mJ commercial hot water systems.

Copyright © 2018 | G2tech.net.au | All Rights Reserved | t. 1300 428 111